Mobile crane lifting a steel beam beside a partially erected steel frame
Example project · illustrative photographs

Industrial / Portfolio

Steel-frame lift example

Steel-frame lifting beside a partially erected building structure.

Project profile

Steel-frame lift example

Industrial

Project summary

Steel-frame lifting beside a partially erected building structure.

Project description

A steel member hangs beside a partially erected building frame, with the mobile crane positioned alongside the steelwork. The wider view includes workers, an excavator and stored steel, placing the suspended member in its surrounding construction setting.

Supporting photographs show another steel-beam lift, reinforcing materials and a suspended rectangular structure, with both close and wider views of the cranes and loads.

Project value (AUD)
$18,500.00 AUD
Discuss a similar lift

Project photographs

Talk through your lifting requirements.

Share the load, location, access and timing for your enquiry. We can discuss what information is needed to plan the next steps.

CraneSafe accreditationCraneSafe accreditation. View the available safety and compliance documents on our Documents page.WorkCover New South WalesWorkCover NSW. Review the supplied documentation and confirm site-specific requirements before a lift.Fully insuredInsurance documentation. Review the published insurance certificates and confirm that the cover meets your project's needs.
Back to top. Return to the beginning of this page. The gold ring shows your reading progress.