Mobile crane lifting bundled reinforcing rods beside stacked building materials
Example project · illustrative photographs

Industrial / Portfolio

Materials handling example

Reinforcing materials being handled beside a construction work area.

Project profile

Materials handling example

Industrial

Project summary

Reinforcing materials being handled beside a construction work area.

Project description

Bundles of reinforcing steel are being lifted above stacks of rods and other building materials. The crane's outriggers extend into the open work area, with the suspended bundle and its slings clearly visible against the ground below.

The gallery adds views of concrete-member and steel-beam lifting, together with a structure suspended beside a crane. The photographs show different materials and lifting arrangements within their surrounding work areas.

Project value (AUD)
$8,500.00 AUD
Discuss a similar lift

Project photographs

Talk through your lifting requirements.

Share the load, location, access and timing for your enquiry. We can discuss what information is needed to plan the next steps.

CraneSafe accreditationCraneSafe accreditation. View the available safety and compliance documents on our Documents page.WorkCover New South WalesWorkCover NSW. Review the supplied documentation and confirm site-specific requirements before a lift.Fully insuredInsurance documentation. Review the published insurance certificates and confirm that the cover meets your project's needs.
Back to top. Return to the beginning of this page. The gold ring shows your reading progress.